Chair of Mining Engineering and Mineral Economics (200)

Organisational unit: Chair

Publications / Theses

  1. 2009
  2. Published
  3. Published

    TRUCKING VS IN PIT CRUSHING AND CONVEYING COMPARISON IN NORTH AMERICA

    Maki, B., 2009

    Research output: ThesisMaster's Thesis (University Course)

  4. Published
  5. Published

    Überlegungen zum Verhalten bei Krisen in Bergwerken

    Maier, A., 2009, In: Berg- und hüttenmännische Monatshefte : BHM. 154, p. 255-259

    Research output: Contribution to journalArticleResearchpeer-review

  6. Published

    Underwater dredge mining

    Pöhl, A., 2009

    Research output: ThesisMaster's Thesis

  7. Published

    Value of increased production in an underground mine: Production loading

    Jukakoski, M. A., 2009

    Research output: ThesisMaster's Thesis (University Course)

  8. Published

    Zur Frage der Versorgungssicherheit mit fossilen Energieträgern Teil 2: Kohlenwasserstoffe

    Wagner, H. & Hofstätter, H., 2009, In: Berg- und hüttenmännische Monatshefte : BHM. 154, p. 377-379

    Research output: Contribution to journalArticleResearchpeer-review

  9. 2008
  10. Published

    A device, charging unit and method of filling a borehole with an explosive material

    Finn, O., Moser, P., Finn, O., Moser, P. & Hohl, W., 11 Dec 2008, IPC No. F42D 3/ 04 A I, Patent No. AU2008258857, Priority date 4 Jun 2008, Priority No. WO2008EP04452

    Research output: Patent

  11. Published

    A DEVICE, CHARGING UNIT AND METHOD OF FILLING A BOREHOLE WITH AN EXPLOSIVE MATERIAL

    Moser, P., Ouchterlony, F. & Hohl, W., 11 Dec 2008, IPC No. F42D 3/ 04 A I, Patent No. CA2690037, Priority date 4 Jun 2008, Priority No. WO2008EP04452

    Research output: Patent

  12. Published

    A DEVICE, CHARGING UNIT AND METHOD OF FILLING A BOREHOLE WITH AN EXPLOSIVE MATERIAL

    Moser, P. & Ouchterlony, F., 11 Dec 2008, IPC No. F42D 3/ 04 A I, Patent No. WO2008148544, Priority date 4 Jun 2007, Priority No. EP20070010995

    Research output: Patent